Anacortes Siding Contractors
Composite Decking · Anacortes, WA

March Point Composite Decking Built for Salt Air & Rain

Home › March Point Composite Decking Built for Salt Air & Rain
25 Years in Business2,000+ ProjectsLicensed & InsuredFree EstimatesServing Anacortes & Skagit County

Decking on March Point Has to Answer to the Water

March Point sits out on the water, surrounded by Fidalgo Bay and Padilla Bay, which means every deck built here is fighting a different battle than a deck built inland in Skagit County. Salt-laden air moves through constantly, driving rain comes in sideways off the water for months at a time, and the shaded, damp stretches of the year grow moss and algae on almost any horizontal surface that isn't built to shed water fast. A deck that would hold up fine in a dry inland yard can start showing problems within a couple of seasons out here if it wasn't built with this specific environment in mind.

Composite decking is a good match for March Point when it's specified and installed correctly, because the board material itself resists rot, doesn't need annual staining, and won't splinter or cup the way wood does after repeated wet-dry cycles. But the board is only part of the job. The substructure underneath it, the fasteners holding it together, and the way water is directed off and away from the house are what actually determine whether the deck is still solid and good-looking in ten or fifteen years.

What the Local Climate Actually Does to a Deck

Salt Air

Airborne salt from the bay settles on every exposed surface, including metal hardware, fastener heads, and any exposed framing connectors. Over years, ordinary hardware corrodes, fasteners weaken, and rust streaks can bleed through onto lighter-colored composite boards. This is the single biggest reason we're picky about hardware selection on March Point jobs.

Driving Rain

Rain here often doesn't fall straight down — wind off the water pushes it sideways into ledger boards, house siding, and the gaps between decking and the home. If flashing and water diversion aren't done right at the point where the deck meets the house, water gets behind siding and into framing, and you won't see the damage until it's already spread.

Moss and Algae Season

Shaded, low-airflow decks in this part of Skagit County grow moss and green algae film for a good stretch of the year, especially on the north or water-facing side of a home. This isn't just cosmetic — a slick, moss-covered deck surface is a slip hazard, and moss that's allowed to sit traps moisture against the board surface longer than it should.

Choosing the Right Composite Board for This Environment

Not all composite decking is built the same, and the differences matter more here than in a dry climate. We generally steer March Point homeowners toward fully capped composite boards — meaning the wood-plastic core is wrapped on all sides with a protective polymer shell — rather than uncapped or cap-stock-only products.

  • Fully capped composite: Resists moisture absorption at the core, which matters when the board is getting rained on sideways for days at a stretch. Easier to keep clean of moss film since the surface doesn't have exposed wood fiber to hold moisture.
  • Uncapped or partially capped composite: Costs less up front, but exposed wood-fiber content at cut ends or on the board face can wick moisture, which shortens the board's practical life in a wet marine climate and gives algae something to grip.
  • Color and finish: Lighter colors show salt residue and water spotting more readily; streaked or multi-tonal colors hide the mineral deposits and light debris that accumulate between cleanings.

We'll walk through board options with you at the estimate and explain the honest trade-offs — there's rarely a single "best" board, just the right fit for your budget, your deck's sun and shade exposure, and how much upkeep you want to do.

The Substructure Is Where Decks Actually Fail

Composite board manufacturers can only warranty the board — they can't fix a deck that's failing because of what's underneath it. On a March Point job, the framing and substructure decisions matter as much as the decking material itself.

Framing and Ledger Attachment

Where the deck ledger board bolts to the house is the single most important water-management point on the whole structure. We flash this connection properly, with the flashing lapped correctly under the house's weather-resistant barrier or siding rather than just caulked on top, so wind-driven rain can't track behind it and into the wall framing.

Joist Protection

Untreated or poorly sealed joists sitting under a composite deck in a wet climate can rot from below even while the composite boards on top look fine. We use joist tape or an equivalent sealed barrier on top of framing members to keep water from sitting in fastener holes and end grain.

Ventilation and Ground Clearance

Low, tight-to-the-ground decks trap damp air underneath, which feeds both wood rot in the framing and moss growth on the underside of boards. We maintain proper clearance and airflow paths under the deck wherever the design and grade allow it.

Fasteners and Hardware: Where Salt Air Does Its Damage

This is the detail that separates a deck that's still tight in fifteen years from one that starts rattling and staining in three. In a salt-air environment, we specify stainless steel or marine-grade coated fasteners and structural hardware rather than standard galvanized components, particularly for anything exposed or near the water side of the home. Hidden fastener clip systems, which are common with composite boards, also need to be rated for the corrosion exposure they'll actually see here — not just the manufacturer's baseline spec.

Hardware ChoiceBehavior in Marine AirWhere We Use It
Standard galvanized fastenersCoating breaks down over time with salt exposure; rust can bleed onto light boardsAvoided on exposed or water-facing structures
Stainless steel fastenersHigh corrosion resistance, holds up well long-term near the bayStandard on March Point decking and ledger attachment
Marine-grade coated structural connectorsRated for coastal exposure, resists corrosion at joist hangers and post basesFraming connections, especially near grade
Composite hidden fastener clipsPerformance varies by manufacturer ratingMatched to board brand and corrosion rating at install

Our Process, Start to Finish

We keep the process straightforward and explain each step before we start, so there aren't surprises once the crew is on-site.

  1. On-site assessment: We look at sun/shade exposure, drainage patterns, proximity to the water side of your lot, existing structure condition, and any moss or moisture issues on your current deck or siding.
  2. Design and board selection: We walk through composite board options, colors, and railing choices suited to your home and budget, with the climate trade-offs explained plainly.
  3. Permitting: Deck work in unincorporated Skagit County or within Anacortes city limits typically requires a permit depending on size and height — we handle that paperwork so it's not on you.
  4. Demo and framing: Removal of the old structure if needed, followed by framing built to current code with corrosion-appropriate hardware and joist protection.
  5. Ledger flashing and waterproofing: Proper integration with your home's siding and weather barrier before a single deck board goes down.
  6. Decking and railing installation: Composite boards installed per manufacturer spacing and fastening specs, adjusted for our climate where experience tells us it matters.
  7. Final walkthrough: We go over basic care with you and point out anything worth watching in year one.

Living With a Composite Deck in a Wet, Salty Climate

Composite decking is lower-maintenance than wood, but "low-maintenance" doesn't mean "no maintenance" in this climate. A little seasonal attention keeps a composite deck performing the way it should for the full length of its service life.

  • Rinse or sweep the deck surface periodically through the wet months to keep moss spores and organic debris from getting a foothold.
  • Clean visible moss or algae with a soft brush and a cleaner rated for composite decking — avoid pressure washing at close range or high pressure, which can damage the cap layer.
  • Keep gutters and downspouts near the deck clear so roof runoff isn't dumping extra water directly onto the deck surface or ledger connection.
  • Trim back overhanging vegetation to improve airflow and sun exposure, both of which slow moss growth.
  • Check railing posts and stair connections annually for movement, especially after a hard winter storm season.
  • Watch for any staining at fastener heads or hardware, which can be an early sign a component needs replacing before it fails.

Why It Matters That We Already Work March Point

A contractor who mostly builds decks in drier parts of the state can still put together a deck that looks right on installation day. The difference shows up two or three winters later, when a ledger connection that wasn't flashed for wind-driven rain starts leaking, or standard hardware starts rusting because it wasn't rated for salt air. We build decks in this specific stretch of Skagit County regularly, so the flashing details, fastener specs, and framing protection we use aren't generic — they're calibrated to what actually happens to a deck sitting near Fidalgo Bay through a full Pacific Northwest wet season.

If you're planning a new deck or replacing one that's showing its age, we're happy to take a look and put together a straightforward, no-pressure estimate. Use the form below to get started, and we'll talk through what your home and site actually need.

FAQ

Frequently asked questions

What's the real difference between composite decking and pressure-treated wood for a home like mine?

Composite won't rot, splinter, or need annual staining the way wood does, which matters in a climate with this much rain and humidity. It costs more upfront than wood, but the maintenance savings and longer service life usually even that out over time, especially in a salt-air location.

What should I ask a contractor before hiring them for a composite deck build?

Ask what fastener and hardware grade they use, whether they flash the ledger connection to the house, and how they protect the joists from moisture. Those three details matter more to long-term performance than the brand of composite board on top, and a contractor who can't answer them clearly is worth a second look.

Are all composite decking brands basically the same?

No — boards vary in whether they're fully capped or only partially capped, how they handle moisture at cut ends, and how their hidden fastener systems are rated for corrosion resistance. We'll walk you through the options that make sense for a marine-air location rather than pushing one brand.

What does "capped" composite actually mean, and why does it matter here?

A capped board has a polymer shell wrapped around the wood-plastic core on all sides, which keeps moisture from soaking into the core material. In a climate with extended wet seasons and driving rain, that moisture resistance directly affects how long the board holds up and how easily moss and algae wipe off the surface.

Does deck work near March Point require a permit?

Most new decks and many deck replacements in Skagit County and within Anacortes city limits need a permit depending on size, height, and whether the structure is attached to the house. We handle the permit paperwork as part of the job so you don't have to navigate it yourself.

Free, no-pressure estimate

Get expert help in Anacortes.

Have questions about your deck project? Our local crew serves Anacortes and all of Skagit County — call or request a free on-site estimate.

360-967-0530

More guides

Related resources

Premium Brands We Install

James HardieFiber Cement Siding
TimberTechComposite Decking
FiberonComposite Decking
Sherwin-WilliamsExterior Paint
AZEKTrim & Mouldings
IKORoofing
ProViaEntry Doors
MilgardWindows
AndersenWindows
GAFRoofing
CertainTeedRoofing
James HardieFiber Cement Siding
TimberTechComposite Decking
FiberonComposite Decking
Sherwin-WilliamsExterior Paint
AZEKTrim & Mouldings
IKORoofing
ProViaEntry Doors
MilgardWindows
AndersenWindows
GAFRoofing
CertainTeedRoofing